SUPPLIER QUALITY REQUIREMENTS (SQR's)
Q01   MANDATORY AMRO SOURCE INSPECTION
When specified on individual Purchase Orders, Amro Source Inspection shall be performed at supplier’s facility prior to shipment to Amro, and at required process operations, as directed by Amro.
Q02   OPTIONAL AMRO SOURCE INSPECTION
Amro reserves the right to inspect any and/or all work on this Purchase Order at the supplier’s facility. The supplier will be notified in advance of shipping date if Amro source inspection is required.
Q03   OPTIONAL CUSTOMER SOURCE INSPECTION
Amro Customer reserves the right to inspect any and/or all work on this Purchase Order at the supplier’s facility. The supplier will be notified of shipping date if Customer source is required.
Q04   GOVERNMENT SOURCE SURVEILLANCE
The Government has the right to inspect any or all of the work included in the Purchase Order at the supplier’s facility.
Q05   GOVERNMENT SOURCE INSPECTION
Government inspection is required prior to shipment from the supplier’s facility. Upon receipt of this order, promptly notify the government representative who normally services your facility so that appropriate planning for government inspection can be accomplished.
Q06   PRODUCT ASSURANCE SYSTEM REQUIREMENTS
he supplier shall have Product Assurance system and procedures detailing the following minimum requirements:
The supplier’s product assurance system is subject to initial survey and approval by Amro and it’s Customer. Subsequent surveys or audits, including subtier supplier and processors may be conducted before or after issuance of a Purchase Order. The supplier shall be notified of deficiencies and shall follow-up and ensure that deficiencies are promptly corrected. Corrective action shall be subject to review and approval by Amro’s Quality Assurance.
Q07   QUALITY PROGRAM REQUIREMENTS
The seller shall have developed and maintain a quality program in accordance with Mil-Q-9858, including a measuring instrument calibration system in accordance with Mil-Std-45662
Q08   INSPECTION SYSTEM REQUIREMENTS
The seller shall have developed and maintain an inspection system in accordance with Mil-I-45208, including a measuring system in accordance with Mil-Std-45662.
Q09  NON-CONFORMING DOCUMENTATION
Any deviation to Amro’s requirements set forth in this Purchase Order shall be documented and submitted to Amro for disposition prior to product shipment from supplier’s facility.
Q10   METROLOGY / ACCURACY
P> All test and measurement equipment used in the performance of this Purchase Order shall be certified against a standard having greater accuracy. Random and systematic error in any article or material measurement process shall not exceed 10% of the tolerance of the parameter being measured. When ASTM, ASA, ISA, Military Standards or other Aerospace Industry recognized standard test methods are used in physical, chemical, analytical, optical and/or environmental measurement processes, the tolerance ratio established in those test standards shall apply.
Q11   RAW MATERIAL CERTIFICATION
Three legible copies of the material certification as furnished by the raw material supplier shall accompany each shipment.
Q12   CHEMICAL TEST REPORTS
Materials furnished in fulfillment of this order must be accompanied by three legible copies of certified test reports of the chemical properties of the material.
Q13   PHYSICAL TEST REPORTS
Materials furnished in fulfillment of this order must be accompanied by three legible copies of certified test reports of the physical properties of the material.
Q14   CERTIFICATION OF COMPLIANCE
The seller shall include with each shipment three legible copies of a certifying statement that attests to the seller’s compliance with all the requirements of the Purchase Order. The certificate shall be signed by an authorized representative of the supplier.
Q15   PROCESS / PROCESSOR
Manufacturing and inspection processes and procedures used in the performance of this Purchase Order must be accomplished by process sources and procedures approved by Amro and Amro’s Customer.
Q16   SPECIAL PROCESS APPROVAL
Special process suppliers are responsible for compliance to the applicable specifications, including customer special process approval, whether the operation is performed within their facility or by subcontractors.
Q17   PROCESS CHANGE
A change is defined as "any change including personnel, equipment, material, tooling, etc., subsequent to the start of production." The supplier is responsible for supplying Amro with a list of all personnel performing work on LMET Program and to notify Amro of any additions/deletions to this list. Supplier is also responsible for notifying Amro of any intended changes to equipment, material, tooling, etc., and obtaining written authorization for said changes from Amro prior to implementation. Supplier is also responsible to obtain Amro and LMMSS approval in writing to any deviation and/or exception to procurement specification.
Q18   RIGHT OF ENTRY / CUSTOMER ACCESS
Access to your facility (documents, personnel, equipment, material and facilities) shall be made available to Amro Fabricating Corporation, its customers and regulatory agencies, to determine and verify the quality of the work, records, and material.
Q19   SUBCONTRACTING WORK
Seller is prohibited from subcontracting any portion of the work to be perfomed as specified in this Purchase Order, unless authorized by the buyer in writing.
Q20   RECORDS
Seller shall maintain records of manufacturing and traceability of materials used in the fabrication of the product produced in fulfillment of this Purchase Order. The records shall be maintained for a period fo 7 years after completion of the Purchase Order and be made available for review to the buyer upon request.
Q21   SPC FLOW DOWN
Seller shall demonstrate the ability to provide statistical evidence of variability for KEY characteristics. Seller to certify that they have a system capable of meeting Boeing’s D1-9000, AQS, or similar quality requirements.
Q22   SERIALIZATION
Each item furnished on this Purchase Order will be identified with a non-recurring serial number. Where the size of the item prohibits identification, the serial number will be marked on an identification tag or label and be securely attached to each item.
Q23   Digital Product Definition (DPD)
Seller is required to obtain Buyer approval as a DPD-capable supplier if Seller receives, downloads, and/or uses Computer Aided Design (CAD) geometry in any format AMRO furnished digital datasets are reference only (not design or inspection authority) until DPD approval status is obtained.
Q24   Digital Product Definition (DPD)
The seller shall have developed and maintain a Digital Product Definition program in accordance with Boeing document D6-51991.
Q25   Supplier Inspection Reporting Requirements
Supplier shall submit with each shipment / delivery of Purchase Order items one copy of an inspection report. Reflecting 100 percent inspection verification of all drawing characteristics and specify the corresponding actual measurement results. Inspection reports will include Purchase Order number, detail or assembly number as indicated per purchase order. Inspection reports shall include signature and/or stamp of person within your organization performing inspection process.